Application case 7: Graphite electrode baking control system scheme
一. Baking control system for graphite electrode
1. Overview of granite electrode baking furnace
Combustion apparatus and controlling system of granite electrode baking furnace are used for 2 sets of baking furnace for 36. Baking furnace are ring type one with cover. Combustion apparatus include gas burning furnace, connected vessel hood (smoke removal frame) and equipment for detecting temperature and pressure, automatically regulate and measuring gas. Each furnace chamber has 5 combustors. There is1set of combustion apparatus and automatic controlling system.
2. Controlling method
Using an adaptive prediction optimization control of modern control theory
3. Technical requirements for system operating
Systems of 11 chambers operate at the same time and the combustion period for each system is36~48h. Temperature for the gas inside the baking furnace is 1050-1250℃. The final temperature of the product in the baking furnace is 850-950℃.
4. Fuel types
Gas, heavy fuel oil, heating gas (or cooled coal gas)
5. Technical parameters for baking furnace.
No. |
Project name |
Index |
1 |
Number of chambers |
36/set |
2 |
Number of workbin (gas well) |
5/chamber |
3 |
combustor |
2/chamber |
4 |
Period for moving oven chambers |
36~48h |
5 |
Temperature for the gas inside |
1050~1250℃ |
6 |
Final temperature of the product |
850-950℃ |
7 |
Size of workbin |
3900(L)×780(W)×4340(H)mm |
8 |
Filling coke |
3~12mm metallurgical coke |
9 |
Product standard |
699x525x(3500~4000) 544x475x(3500~4000) |
10 |
Distribution of each set of flame system |
16 chambers |
11 |
Heating chamber |
3 |
12 |
Preheating chamber |
5 |
13 |
Cooling chamber |
4 |
14 |
Loading and maintaining chamber |
4 |
二、 Basic technical requirements and quantities supplied (each burner
)
1. Natural gas burner(flow meter, nozzle): 5/chamber
The highest combusting temperature of fuel gas:1050-1250℃
The final temperature of product:850-950℃
Connecting method of metal hose of combustors: 600 mm, 360sets
Fine tuned valves (2 inches): 36 sets
Flow transmitter (2 inches): 1set
Safety solenoid valve (2 inches): 36 sets
Buffer tank of gas: 108m rectangular tube
Ball valve (2 inches): 36 sets
Check valve (6 dm): 216
Gas filter: 1 set
Number of equipment sets: (180X2) set
2. Connected vessel hood (smoke removal frame) (manual butterfly valve included)
Temperature of gas: 700℃
Measuring range of pressure: -400~0Pa, on-site examination with ball valve
Number of equipment:3 /set
Connected vessel hood valve use DLVD
3. Temperature measuring equipment
Gas inside the furnace: temperature measuring range:0~1600℃,temperature can transmit far away
Gas at the bottom of the furnace: temperature measuring range: 0~700℃, temperature can transmit far away
Funnel temperature measuring range: 0~700℃, temperature can transmit far away
Number of thermocouple and temperature variation: 41 sets
4. Control system
It requires central and local duel control. Basic function of central control system of computers include display, set, control, save (data within a year), data processing and alarming. When the center controls the system fault, the local control system can maintain production according to the set index.